|
6/15/2004 –
Present
Coca-Cola Bottling Co. Consolidated
Maintenance-Planner/Scheduler
Planning of work to be performed by the entire maintenance group, both building and production. Layout of all
jobs including parts selection, labor time, material costs and specifying details of work to be performed. Data entry into the Maximo computer system including work requests, parts info, preventative maintenance work
orders, inventory data, work orders. Work closely with maintenance and production management to schedule and assign maintenance
work of all types, including PM schedules and coordinating work schedules of shifts and technicians. Knowledge of MSOffice,
PC’s, and the ability to work well with others, including assigning jobs and correcting errors, and communicating technical
ideas and goals as well as attention to detail, are must have skills. Other duties include working with outside vendors, trainers
and contractors, assorted clerical chores, filling in for maintenance technicians during their vacation time and other absences,
assist and support maintenance management.
10/1/2001 – 6/14/2004
Maintenance-Lead
Technician
Electrical and Mechanical Maintenance, preventative
and corrective maintenance. Maintained Automated, PLC controlled equipment and
support systems used in the cold beverage bottling process. PLC trouble-shooting and programming, working with freq. drives,
motor starters, conveyors, gearboxes, chain drives, pumps, valves. Welding of stainless steel, (arc, mig, gas and tig), fabrication
of parts using machine tools.
8/25/2001 – 9/27/2001 PC Land Inc.
Computer
Technician
Worked part-time as Personal Computer Technician,
repairing, upgrading, and building computer systems and servicing network computers and peripherals.
9/25/1989 – 9/25/2001 Vishay-Vitramon
Maintenance-
Instrumentation- Groupleader
Industrial maintenance; CNC, PLC programming,
electronic controllers, freq. drives, digital and analog circuits, three phase electrical, AC & DC electrical, pneumatic,
hydraulic, plumbing, installing new equipment, repairing equipment. Setup, Repair and Calibrate YAG and Eximer Lasers. Mechanical maintenance, including machine shop work, overhaul and rebuild work, work
with bearings, pumps, gears and seals, welding and fabrication. Job required ability to service computers and workstations,
work with Windows, NT, DOS, OS400, install CAT 5 cable and fiber for networks, assist IT dept. with network support. Maintained
plant telephone system. During last six years of job, held the position of Group Leader. Responsible for others as their direct
supervisor. Responsible for their work orders, reviews, pm’s, disciplinary actions and any other managerial duties that
may come about.
1/21/1985
– 9/22/1989 Gardner
Denver, Mining and Construction
Hydraulic and Electrical Assembler
Worked on all phases of assembly, everything
from custom building hydraulic lines to wiring instrument panels. Required welding, mechanical, fabrication, blueprint and
schematic reading, hydraulic, pneumatic and electrical skills.
Maintenance Technician
Responsible for building and machine maintenance,
repair and service CNC and manual machine tools, overhead cranes, welders and electric forklifts, equipment installation,
rebuilding of mechanical assemblies.
Electrical Design Draftsman and Engineer’s
Assistant
Drawing electrical schematics, wiring diagrams,
bills of material, engineering change requests and notices. Involved with research and development of new electrical designs.
Used CAD and conventional drafting methods and a variety of filing and plotting equipment. Worked with outside venders and
suppliers of parts, ordered new parts for testing. Responsible for scheduling of tests and design implementation. |